Case Studies
Integrated Environmental Providers design and construct erosion and sediment control systems, using the revolutionary FILTREXX system, which sets new standards for environmental protection.
Inlet Soxx
- Samples
- Two metre lengths of Inlet Soxx
Channel Soxx
- Fish Ladder / Weir Construction
- This project involved re-establishing creek embankments and construction of a series of weirs to create a fish ladder.
- Tugun Bypass, Tweed Heads
- Installation of Channel Drain to divert concentrated water flow.
Silt Soxx
- Road Sediment Control
- The part-construction of this road borders a sensitive wetland.
Ditch Chexx
Filter Ring
Compost Blankets
- Revegetation (Gladstone, QLD) - December 2007
- Bank Stabilisation and revegetation for new residential estate.
- Bank Stabilisation (Tweed Heads) - January 2007
- Bank Stabilisation and revegetation after a landslide.
- Road Sediment Control
- The part-construction of this road borders a sensitive wetland.
- Bank Stabilisation - Merrimac Sewerage Treatment Plant
- Integrated Environmental Providers were engaged to stabilise the embankment by installing Filtrexx Compost Blanket, Filtrexx Living Wall and Filtrexx Sediment Control, as well as grassing the surrounding area.
- Mr Billabong's Bridge
- Engineers working on the Tugun Bypass created a bridge to access a private residence owned by the founder of the "Billabong" Brand Gordon Merchant.
CVC
- Blower Truck Installation
- Our versatile BB1216 Material Blowers are ideal where access is an issue.
Edge Saver
- Edge Saver
- Construction of Stream Bank Stabilisation System using FILTREXX Edge Saver.
- Stabilising and revegetating a creek bank – New Zealand
- Creek bank eroded by flood water. Stabilised and revegetated using Filtrexx® systems by Rural Supply Technologies NZ
Return to main Case Studies page.